Installation Requirements

Everything you need to know about what's required to install and use your welding cobot

Matt Bush avatar
Written by Matt Bush
Updated over a week ago

Space Requirements

Power Requirements

Welder

3 Phase Power

MODEL

208V

230V

400V

460V

575V

Invision 352

60A

50A

30A

25A

20A

Invision 450

Not Available

80A

Not Available

40A

Not Available

Single Phase

MODEL

208V

230V

400V

460V

575V

Invision 352

80A

80A

45A

40A

30A

Invision 450

Not Available

Not Available

Not Available

Not Available

Not Available

Robot

  • 110V, Minimum 2 Outlets, 15A Circuit

Other Requirements

Portable weld curtains

  • Weld curtains large enough to enclose the space required for the system installed

Fume extraction

  • Portable or fixed fume extraction

Mobile Device

  • The Beacon app supports both iOS and Android phones and tablets and is also accessible over the web

  • Mobile devices can be connected via WiFi to the corporate network or over a cellular network

  • The mobile device is how all teaching, part selection, monitoring, and support will be performed

Did this answer your question?